================================================== ps4078 d:\northps\block123-14dec07\ps4078.txt 15 Dec 07 17:01:45 Saturday elapsed time 00:06:24 Rectangular area = 0.875 km2 Data area = 0.874 km2 *percent double coverage = 69.647 **low-curvature dc area = 0.001 km2 1st-return RMSE, low-curvature areas = 0.754 95p = 1.811, 98p = 2.997, 99.5p = 3.549 BE RMSE = 2.397 95p = 4.684, 98p = 6.632, 99.5p = 10.956 1450754 unique returns and 0 duplicate returns 365057.947386 1287895.3 568251.81 616.2 2 2 365072.028156 1286992.19 565252.11 490.1 1 1 1066.800607 366138.828763 1287719.95 565252.14 350.91 1 2 366153.64758 1285301.0 568251.96 431.64 1 1 355.77865 366509.42623 1285726.73 568251.38 409.62 2 1 366522.90491 1285517.1 565252.22 674.3 1 1 1245005 1st returns 193028 2nd returns 12544 3rd returns 177 4th returns 63190 ground returns 0 blunders curvature versus slope n = 164629 X=0, Y = 46.67 +/- 30.79 Weighted least-squares fit: Y = 64.9 + 1.393 X + -0.01409 X**2 slope versus dZ, curvature < 5 n = 6839 Weighted least-squares fit: Y = 9.2 + 0.187 X + 0.00287 X**2 at X = 100, Y = 56.6 effective RMSE xy = 87.7 slope versus dZ, curvature < 15 n = 23989 Weighted least-squares fit: Y = 9.5 + 0.249 X + 0.00258 X**2 curvature versus dZ, slope < 10 n = 1550 X=0, Y = 11.67 +/- 8.16 Weighted least-squares fit: Y = 9.7 + 1.408 X + 0.00708 X**2 Number of samples 166211 Max dz = 900 Mean dz = 58 RMS dz = 103.812330674 100cm = 83.6689509118 percentile value of dz Number of survey units in 1 meter = 3.208 Nominal spot spacing (in survey units) = 5 Nominal pulse density (per m2) = 1 Difference cell size = 2.5 IsData cell size = 1.25 IsData expand cells = 8 IsData shrink cells = 7 BE IsData cell size = 2.5 BE IsData expand cells = 24 BE IsData shrink cells = 24 MaxCurve = 24.69903359999 Curvature expand cells = 4 Curvature shrink cells = 3 Point density cell size = 20 Color critical value = 0.3208 Hue jump at critical value = 90